![gx works 2 system requirements gx works 2 system requirements](https://kr.mitsubishielectric.com/fa/ko/fa/products/cnt/plcq/pmerit/network/images/ccie_f_03.gif)
If you want to use Access databases for the parts management, the project management and the dictionary, the Microsoft operating system has to be installed in the 64-bit version. Since the EPLAN platform is available as a 64-bit version, please observe the following points:
#Gx works 2 system requirements pro#
![gx works 2 system requirements gx works 2 system requirements](https://www.faweb.net/uploads/8ee89b4d2bfd4a265a8284b20e122af7.jpg)
After confirmation of the entry a dialog with information about the operating system is opened, including the build number. via the + shortcut keys) and enter the winver command there.
#Gx works 2 system requirements windows 10#
To display the build number of a Windows 10 version, open the Windows-specific Run dialog (e.g. Microsoft Windows 10 (64 bit) Pro, EnterpriseĬurrently supported versions of Windows 10.Microsoft Windows 8.1 (64 bit) Pro, Enterprise.The EPLAN platform has been cleared for the following operating systems: Workstation The EPLAN language installed must be supported by the operating system. The EPLAN platform supports the 64-bit variants of the Microsoft operating systems Windows 8.1 and Windows 10. Further information and the current version of this Microsoft component are available for download from the Microsoft website. As of Version 2.9 the Framework of Microsoft 4.7.2 is required. NET Framework 4.5.2 is required to operate the EPLAN platform up to Version 2.8. The transfer of simple assignment lists is not affected by this. Subsequently, PLC data exchange is only possible via the "AutomationML" standard. The PLC data exchange of older versions by Rockwell Studio 5000 Architect, Beckhoff TwinCAT, Logi.cads Logi.CAD and Mitsubishi GX Works 2 with the EPLAN Platform supported until Version 2.9."AutomationML" is also offered by Rockwell Studio 5000 Architect as of Version 3.0 Beckhoff TwinCAT3 as of Build number 4024 and Logi.cads Logi.CAD 3 Mitsubishi iQ-Works. EPLAN is changing over the PLC data exchange with the EPLAN Platform to the "AutomationML" industry standard.